Training Plan - Methods – Machine Shop MET


  • PPS 1.21 Machining Processes for Metallic Parts 
  • VPS 2.27 Installation of Lee Plugs 
  • PPS 2.27 Installation of Lee Plugs 
  • VPS 10.17 Machining of Plastics 
  • PPS 10.17 Machining of Plastics 
  • VPS 12.04 Installation of Interference Fit Bearings and Bushings using Liquid Nitrogen 
  • PPS 12.04 Installation of Interference Fit Bearings and Bushings using Liquid Nitrogen 
  • VPS 20.07 Electrical Conductivity Testing of Aluminum Alloys 
  • PPS 20.07 Electrical Conductivity Testing of Aluminum Alloys 
  • VPS 20.08 Hardness Testing of Metals 
  • PPS 20.08 Hardness Testing of Metals 
  • VPS 23.02 Protective Treatment and Decorative Surface Finish Code System 
  • PPS 23.02 Protective Treatment and Decorative Surface Finish Code System 
  • VPS 30.01 Heat Treatment of Aluminum and Aluminum Alloys 
  • PPS 30.01 Heat Treatment of Aluminum and Aluminum Alloys 
  • VPS 30.04 Steel Heat Treatment – Carbon & Low Alloy Steels 
  • PPS 30.04 Steel Heat Treatment – Carbon & Low Alloy Steels 
  • VPS 31.17 Solvent Usage 
  • PPS 31.17 Solvent Usage 
  • VPS 45.01 Thermoplastic Fused Filament Fabrication 
  • VAPS 168-007 Heat Treatment of Aluminum Alloys 
  • VAPS 168-014 Heat Treatment of Carbon and Low Alloy Steels 
  • VAPS 175-005 Installation of Interference Fit Bushings 
  • WI-015-228 Machine Shop CNC Programming 
  • WI-015-282 Fused Filament Fabrication (FFF) 
  • WI-015-283 Barrel Lap Polishing 
  • WI-015-288 Temporary Corrosion Protection of Carbon and Low Alloy Steel Parts 
  • VAERD GEN-003 Substitution of Metallic Material Sizes 
  • VAERD GEN-004 Protective Finish Codes 
  • VAERD CL415-001 Finish Requirements for Amphibious Aircraft 
  • EMCM (QD-007) Engineering Material Control Manual