- VPS 1.01 Dimpling Aluminum Alloys
- VPS 1.04 Modified Radius Dimpling Equipment
- VPS 1.09 Drilling and Reaming
- VPS 1.33 Countersinking for Flush Head Fasteners
- VPS 2.01 Installation of Solid Rivets
- VPS 2.16 Installation of NAS type Lockbolt Fasteners
- VPS 2.20 Installation of Bolts and Screws
- VPS 2.67 Installation and HI-Lok/Hi-Tigue Fasteners
- VPS 4.19 Cleaning of Fuel Tanks
- VPS 9.06 Electrical Bonding and Grounding of Aircraft Structures
- VPS 14.01 Torquing – Method and Identification
- VPS 16.23 Handling and Protection of Aircraft Parts
- VPS 19.01 Safetying Devices
- VPS 19.02 Application of Anaerobic Sealant/Adhesives
- VPS 20.07 Electrical Conductivity Testing of Aluminum Alloys
- VPS 21.03 Priming, Sealing and Repair of Integral Fuel Tanks
- VPS 22.02 Application of Film Labels
- VPS 30.03 Heat Treatment and Control of 2024 (DD) Rivets
- VPS 31.17 Solvent Usage
- VPS 32.02 Manual Application of Chemical Conversion Coatings
- VPS 34.08 Application of Epoxy-Polyamide Primer (F19 and F45)
- WI-015-215 Zero-Gravity Arm Setup and Operation
- WI-015-275 Cleaning with DS108 for Sealant Application
- WI-015-280 Application of Adhesive for Bonding
- WI-015-07 FOD Prevention
- WI-015-09 Condition of Supply
- WI-015-157 Control of Primer and Paint for Assembly Cell Brush Application
- WI-015-173 Operating FUTEK IHH500 Portable Proof Load Cell
- WI-015-214 Installation of Bearings using Anaerobic Sealant
- WI-015-225 Assembly Control Process