- VPS 1.01 Dimpling Aluminum Alloys
 - VPS 1.04 Modified Radius Dimpling Equipment
 - VPS 1.09 Drilling and Reaming
 - VPS 1.33 Countersinking for Flush Head Fasteners
 - VPS 1.07 Dimpling Ferrous, Nickel and Titanium Alloys
 - VPS 2.01 Installation of Solid Rivets
 - VPS 2.16 Installation of NAS Type Lockbolt Fasteners
 - VPS 2.20 Installation of Bolts and Screws
 - VPS 2.67 Installation oh Hi-Lok/Hi-Tigue Fasteners
 - VPS 9.06 Electrical Bonding and Grounding of Aircraft Structures
 - VPS 14.01 Torquing – Method and Identification
 - VPS 19.01 Safetying Devices
 - VPS 20.07 Electrical Conductivity Testing of Aluminum Alloys
 - VPS 22.02 Application of Film Labels
 - VPS 31.17 Solvent Usage
 - VPS 32.02 Manual Application of Chemical Conversion Coatings
 - VPS 34.08 Application of Epoxy-Polyamide Primer (F19 and F45)
 - WI-015-225 Assembly Control Process
 - WI-015-07 FOD Prevention
 - WI-015-157 Control of Primer and Paint for Assembly Cell Brush Application
 - WI-015-275 Cleaning with DS108 for Sealant Application
 - WI-015-280 Application of Adhesive for Bonding