- VPS 1.01 Dimpling Aluminum Alloys
 - VPS 1.04 Modified Radius Dimpling Equipment
 - VPS 1.05 Ram Coin Dimpling Equipment
 - VPS 1.07 Dimpling Ferrous, Nickel and Titanium Alloys
 - VPS 1.09 Drilling and Reaming
 - VPS 1.33 Countersinking for Flush Head Fasteners
 - VPS 2.01 Installation of Solid Rivets
 - VPS 2.16 Installation of NAS Type Lockbolt Fasteners
 - VPS 2.67 Installation oh Hi-Lok/Hi-Tigue Fasteners
 - VPS 4.08 Internal Pressure Testing of DHC-5, DHC-6, DHC-7 Integral Fuel Tanks
 - VPS 4.19 Cleaning of Fuel Tanks
 - VPS 9.01 Crimping Electrical Terminal Lugs to Copper Wire
 - VPS 9.06 Electrical Bonding and Grounding of Aircraft Structures
 - VPS 9.09 Splicing Electrical Wires
 - VPS 9.20 Crimping of Size 8-0 Electrical Contacts
 - VPS 9.34 Terminating Electrical Shields
 - VPS 9.36 Manual Crimping of Size 12-22 Contacts
 - VPS 14.01 Torquing – Method and Identification
 - VPS 16.23 Handling and Protection of Aircraft Parts
 - VPS 19.01 Safetying Devices
 - VPS 19.02 Application of Anaerobic Sealant/Adhesives
 - VPS 20.07 Electrical Conductivity Testing of Aluminum Alloys
 - VPS 21.03 Priming, Sealing & Repair of Integral Fuel Tanks
 - VPS 22.02 Application of Film Labels
 - VPS 31.17 Solvent Usage
 - VPS 32.02 Manual Application of Chemical Conversion Coatings
 - VPS 34.08 Application of Epoxy-Polyamide Primer (F19 and F45)
 - PPS 1.01 Dimpling Aluminum Alloys
 - PPS 1.04 Modified Radius Dimpling Equipment
 - PPS 1.05 Ram Coin Dimpling Equipment
 - PPS 1.07 Dimpling Ferrous, Nickel and Titanium Alloys
 - PPS 1.09 Drilling and Reaming
 - PPS 1.33 Countersinking for Flush Head Fasteners
 - PPS 2.01 Installation of Solid Rivets
 - PPS 2.16 Installation of NAS Type Lockbolt Fasteners
 - PPS 2.67 Installation of Hi-Lok/Hi-Tigue Fasteners
 - PPS 4.19 Cleaning of Fuel Tanks
 - PPS 9.01 Crimping Electrical Terminal Lugs to Copper Wire
 - PPS 9.06 Electrical Bonding and Grounding of Aircraft Structures
 - PPS 9.09 Splicing Electrical Wires
 - PPS 9.20 Crimping of Size 8-0 Electrical Contacts
 - PPS 9.34 Terminating Electrical Shields
 - PPS 9.36 Manual Crimping of Size 12-22 Contacts
 - PPS 14.01 Torquing – Method and Identification
 - PPS 16.23 Handling and Protection of Aircraft Parts
 - PPS 19.01 Safetying Devices
 - PPS 19.02 Application of Anaerobic Sealant/Adhesives
 - PPS 20.07 Electrical Conductivity Testing of Aluminum Alloys
 - PPS 21.03 Priming, Sealing & Repair of Integral Fuel Tanks
 - PPS 22.02 Application of Film Labels
 - PPS 25.23 Bonding using DHMS A6.11 Type 1 Class1 Adhesive
 - PPS 25.63 Bonding using DHMS A6.11 Type 1 Class2 Adhesive
 - PPS 25.66 Cleanliness Requirements for Application of Adhesives
 - PPS 31.17 Solvent Usage
 - PPS 32.02 Manual Application of Chemical Conversion Coatings
 - PPS 34.08 Application of Epoxy-Polyamide Primer (F19 and F45)
 - WI-015-147 Operating Aerotech 3000 Hydraulic Test Unit
 - WI-015-214 – Installation of Bearings using Anaerobic Sealant
 - WI-015-07 FOD Prevention
 - WI-015-157 Control of Primer and Paint for Assembly Cell Brush Application
 - WI-015-173 Operating FUTEK IHH500 Portable Proof Load Cell
 - WI-015-214 Installation of Bearings using Anaerobic Sealant
 - WI-015-225 Assembly Control Process
 - WI-015-275 Cleaning with DS108 for Sealant Application
 - WI-015-280 Application of Adhesives for Bonding