Training Plan - Methods – Assembly 3


  • VPS 1.01 Dimpling Aluminum Alloys 
  • VPS 1.04 Modified Radius Dimpling Equipment 
  • VPS 1.05 Ram Coin Dimpling Equipment 
  • VPS 1.07 Dimpling Ferrous, Nickel and Titanium Alloys 
  • VPS 1.09 Drilling and Reaming 
  • VPS 1.33 Countersinking for Flush Head Fasteners 
  • VPS 2.01 Installation of Solid Rivets 
  • VPS 2.16 Installation of NAS Type Lockbolt Fasteners 
  • VPS 2.67 Installation oh Hi-Lok/Hi-Tigue Fasteners 
  • VPS 4.08 Internal Pressure Testing of DHC-5, DHC-6, DHC-7 Integral Fuel Tanks 
  • VPS 4.19 Cleaning of Fuel Tanks 
  • VPS 9.01 Crimping Electrical Terminal Lugs to Copper Wire 
  • VPS 9.06 Electrical Bonding and Grounding of Aircraft Structures 
  • VPS 9.09 Splicing Electrical Wires 
  • VPS 9.20 Crimping of Size 8-0 Electrical Contacts 
  • VPS 9.34 Terminating Electrical Shields 
  • VPS 9.36 Manual Crimping of Size 12-22 Contacts 
  • VPS 14.01 Torquing – Method and Identification 
  • VPS 16.23 Handling and Protection of Aircraft Parts 
  • VPS 19.01 Safetying Devices 
  • VPS 19.02 Application of Anaerobic Sealant/Adhesives 
  • VPS 20.07 Electrical Conductivity Testing of Aluminum Alloys 
  • VPS 21.03 Priming, Sealing & Repair of Integral Fuel Tanks 
  • VPS 22.02 Application of Film Labels 
  • VPS 31.17 Solvent Usage 
  • VPS 32.02 Manual Application of Chemical Conversion Coatings 
  • VPS 34.08 Application of Epoxy-Polyamide Primer (F19 and F45) 
  • PPS 1.01 Dimpling Aluminum Alloys 
  • PPS 1.04 Modified Radius Dimpling Equipment 
  • PPS 1.05 Ram Coin Dimpling Equipment 
  • PPS 1.07 Dimpling Ferrous, Nickel and Titanium Alloys 
  • PPS 1.09 Drilling and Reaming 
  • PPS 1.33 Countersinking for Flush Head Fasteners 
  • PPS 2.01 Installation of Solid Rivets 
  • PPS 2.16 Installation of NAS Type Lockbolt Fasteners 
  • PPS 2.67 Installation of Hi-Lok/Hi-Tigue Fasteners 
  • PPS 4.19 Cleaning of Fuel Tanks 
  • PPS 9.01 Crimping Electrical Terminal Lugs to Copper Wire 
  • PPS 9.06 Electrical Bonding and Grounding of Aircraft Structures 
  • PPS 9.09 Splicing Electrical Wires 
  • PPS 9.20 Crimping of Size 8-0 Electrical Contacts 
  • PPS 9.34 Terminating Electrical Shields 
  • PPS 9.36 Manual Crimping of Size 12-22 Contacts 
  • PPS 14.01 Torquing – Method and Identification 
  • PPS 16.23 Handling and Protection of Aircraft Parts 
  • PPS 19.01 Safetying Devices 
  • PPS 19.02 Application of Anaerobic Sealant/Adhesives 
  • PPS 20.07 Electrical Conductivity Testing of Aluminum Alloys 
  • PPS 21.03 Priming, Sealing & Repair of Integral Fuel Tanks 
  • PPS 22.02 Application of Film Labels 
  • PPS 25.23 Bonding using DHMS A6.11 Type 1 Class1 Adhesive 
  • PPS 25.63 Bonding using DHMS A6.11 Type 1 Class2 Adhesive 
  • PPS 25.66 Cleanliness Requirements for Application of Adhesives 
  • PPS 31.17 Solvent Usage 
  • PPS 32.02 Manual Application of Chemical Conversion Coatings 
  • PPS 34.08 Application of Epoxy-Polyamide Primer (F19 and F45) 
  • WI-015-147 Operating Aerotech 3000 Hydraulic Test Unit 
  • WI-015-214 – Installation of Bearings using Anaerobic Sealant
  • WI-015-07 FOD Prevention 
  • WI-015-157 Control of Primer and Paint for Assembly Cell Brush Application 
  • WI-015-173 Operating FUTEK IHH500 Portable Proof Load Cell 
  • WI-015-214 Installation of Bearings using Anaerobic Sealant 
  • WI-015-225 Assembly Control Process 
  • WI-015-275 Cleaning with DS108 for Sealant Application 
  • WI-015-280 Application of Adhesives for Bonding